Scope of Triplenine Group’s Work
Asahi Beverages Tullamarine – Modular CIP System Installation


Triplenine Group supported the delivery of a fully modular Clean-In-Place (CIP) system for Asahi Beverages at their Tullamarine facility, working in collaboration with ME Engineering, who acted as the head contractor and design authority for the project.


Our scope focused on fabrication, assembly, and commissioning support, ensuring the system was delivered efficiently and aligned with the overall project program.



Project Overview


The CIP system was developed as a complete modular solution to enhance cleaning efficiency, improve operational reliability, and support increased production capacity within the existing plant footprint.

The primary CIP skid measured approximately 9.5 metres in length and 2.2 metres in width and incorporated three independent cleaning circuits, along with all associated process equipment, balance tanks, and control systems.



Key System Features


The system comprises three fully integrated CIP circuits, each designed to deliver consistent and repeatable cleaning performance:

  • Integrated process equipment aligned with ME Engineering’s design specifications

  • Balance tanks for efficient chemical and water management

  • Centralised control panel for automated operation and monitoring

  • Hygienic piping systems suitable for food and beverage applications



Modular Fabrication Approach


A modular, off-site fabrication approach was central to the project’s success. The system was fully fabricated and assembled in our workshop prior to delivery, allowing fabrication activities to run in parallel with the client’s on-site civil works.

This approach delivered several key advantages:

  • Reduced overall project duration through parallel workstreams

  • Improved quality control in a controlled workshop environment

  • Safer and more efficient construction outcomes

  • Minimised disruption to ongoing site operations



Steam Heating System


A dedicated steam heating skid was fabricated to support temperature-controlled CIP operation. The system included:

  • Tube-in-tube heat exchangers for efficient thermal transfer

  • Steam control equipment for precise temperature regulation

  • Condensate recovery systems to improve energy efficiency and sustainability outcomes



Chemical Dosing System


The project also incorporated a purpose-built IBC chemical dosing enclosure, designed for safe and accurate chemical handling. This system included:

  • Integrated day tank for chemical storage and management

  • Dosing pumps and metering equipment for controlled chemical injection

  • Enclosed layout to enhance operator safety and accessibility



Tank Supply & Installation


Triplenine Group supplied and installed three new 12,000-litre tanks, fully integrated into the CIP system to increase capacity and operational flexibility.



Installation & Commissioning Support


All equipment was transported to site in modular sections and installed in accordance with the project program. Triplenine Group worked closely with ME Engineering during installation and commissioning, ensuring:

  • Alignment with design and process requirements

  • Efficient integration with existing plant infrastructure

  • Smooth transition from installation to operational readiness



Project Outcome


The completed CIP system delivers:

  • Increased cleaning capacity and efficiency

  • Reliable and repeatable automated cleaning processes

  • Reduced downtime and improved plant utilisation

  • Enhanced sustainability through energy-efficient heating and condensate recovery

Client

Asahi Beverages Tullamarine

Industry

Beverage

Location

Cost

$400k

Duration

6 months

Completion Date

April 2026

Workforce at peak of project

4 personnel
Key Features of this Project

The system comprises three fully integrated CIP circuits, each designed to deliver consistent and repeatable cleaning performance:

  • Integrated process equipment aligned with ME Engineering’s design specifications

  • Balance tanks for efficient chemical and water management

  • Centralised control panel for automated operation and monitoring

  • Hygienic piping systems suitable for food and beverage applications

Triplenine Group Service Capabilities Used in this Project

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page