
project
Mountain Culture Brewery
Scope of Triplenine Group’s Work
Brewhouse & Liquor System Upgrade
Mountain Culture Beer Co – Emu Plains
Triplenine Group delivered the mechanical installation and process piping for the brewhouse and liquor system upgrade at Mountain Culture Beer Co’s Emu Plains brewery.
This project formed part of a major expansion to increase production capacity, while preparing the site for a future automated CIP system.
Scope of Work
Liquor System Upgrade
Installation of new hot liquor tank (HLT) and cold liquor tank (CLT)
Installation of heat exchangers, pumps, and automated valves
Fabrication and installation of stainless steel process piping (304 & 316)
Integration of water, steam, condensate, and air services
Provision for future CIP system connection
Brewhouse Installation
Installation of brewhouse vessels:
Whirlpool, wort kettle, lauter tun, mash tun
Assembly of prefabricated platforms and pipework
Installation of:
Wort cooler skid
Vapour stacks and roof penetrations
Spent grain handling system
Tie-in to existing plant services
Outcome
The upgrade delivered a modern brewhouse and supporting infrastructure, providing:
Increased production capacity
Improved process efficiency
A scalable platform for future expansion
Client
Mountain Culture Beer Co
Industry
Beverage
Location
Cost
$400k
Duration
6 weeks
Completion Date
July 2023
Workforce at peak of project
6

Key Features of this Project
Modular installation using prefabricated systems
Food-grade stainless steel piping to AS1528 standards
Future-ready design for CIP expansion
Delivered within a live production environment
Triplenine Group Service Capabilities Used in this Project
Client
Lorem Ipsum
Industry
Lorem Ipsum
Location
Lorem Ipsum
Cost
Lorem Ipsum
Duration
Lorem Ipsum
Completion Date
Lorem Ipsum
Workforce at peak of project

.png)





