BAXTER HEALTHCARE – TOONGABBIE

Baxter Healthcare – Toongabbie
Project – Sterile Mix Room Installation
Cost – $1.4 Million +
Duration – Nov 09′ to Jan 11’
Workforce – Total at peak of project – 14 personnel

BAXTER HEALTHCARE – TOONGABBIE


TRIPLENINE was mandated by Baxter Aust to install a new wet product mix room at their Toongabbie expansion. This two stage process consisted of full off-site assembly and on site installation.

A major contributing factor to Baxter choosing to engage TRIPLENINE was the ability for us the complete the first stage process of assembling all process tanks, equipment and piping in our workshop, thereby significantly decreasing critical downtime and concurrent project delays. The proposal put forward by our management team allowed the client to bring forward their completion date and reduce their project overrun significantly.

Stage 2 was installation of all new process equipment and integration of the new piping to the existing process systems, all of the integration works was carried out of production hours to avoid downtime to the existing plant, careful planning was carried to execute critical cut in’s safely and on time.

All product contact tube was 100% orbital welded and 90% internally inspected, full QA documentation was compiled throughout the build phase.