Tooheys Brewery - Filtration plant

Brewing Project – Lion Nathan Aust. – Lidcombe Site
Project – New Filtration System Installation
Cost – $2.3 Million +
Duration – Aug 08′ to May 09′
Workforce – Total at peak of project – 28 personnel
Location: Sydney, NSW Australia
Client: Lion Nathan Aust

BREWING PROJECT – LION NATHAN AUST. – LIDCOMBE SITE


TRIPLENINE was contracted by GEA Aust with the requirement for a two stage installation of a new beer processing room. Stage one was to install all new process piping external to the new processing room and integration of the new piping to the existing.

All of the integration works was carried out of production hours to avoid downtime to the brewery, careful planning was carried out to execute critical cut in’s safely and on time. Stage two consisted of installation of a complete new processing area complete with all new processing equipment a total of 10km of services and process tube and pipe installed by our team.

All equipment and piping was installed on time with no recorded lost hours.