PHARMACEUTICAL PROJECT – PHARMAXIS- FRENCHS FOREST NSW

Pharmaceutical Project – Pharmaxis- Frenchs Forest NSW
Project – Pharmaceutical Powder Production Facitiy
Cost – $1.8 Million +
Duration – Feb 09’to Nov 09′
Workforce – Total at peak of project – 12 Personnel
Location: Sydney, NSW Australia
Client: Pharmaxis

PHARMACEUTICAL PROJECT – PHARMAXIS- FRENCHS FOREST NSW


TRIPLENINE was contracted by Hooker Cockram builders to supply a turn key WFI water production system and distribution loop. The design was based on client URS. The system consisted of a 500L per hour RO system, feeding the RO water to the WFI unit. The distribution loop was set to run hot at a consistant 65 degrees. A secondary loop was installed fed from the main loop which cooled the water to required user points.

TRIPLENINE also carried out structural and architectural packages of work for Hooker Cockram for this project, this consisted of mezzanine floor supports, vessel floor penetration rings, stair handrails and protection barriers.

TRIPLENINE was also contracted by GEA Colby to install all powder production equipment and process piping. All preassemble systems were carefully positioned and fixed in place, installation of process piping and CIP piping commenced once the equipment was installed, all process and CIP piping was orbitally welded and documented to form full traceability as per client specifications.