AstraZeneca Solution Preparation Suites

Scope of Triplenine Group’s Work
AstraZeneca first employed Triplenine Group in 2012 to upgrade an existing solution preparation suite. After delivering the new fitout on time and within budget, we have worked with AstraZeneca to upgrade an additional 7 suites as well as other services.


Solution Preparation Suites

Each suite requires precision welding, testing and strict adherence to pharmaceutical-grade QA standards. Key elements of the upgrades include:


  • Fabrication of the internal access platform, stainless steel wall plates and wall and ceiling plates

  • Installation of platform sections around the central tank

  • Electrical cabling

  • Integration of the suites systems and power with other parts of the plant as required


Additional AstraZeneca Project: Water Room (2018)

In 2018 Triplenine Group also installed a new water room for AstraZeneca. This dedicated clean room included:


  • Storage tanks

  • RO (reverse osmosis) pre-treatment skid

  • WFI (Water for Injection) still

  • Pure steam generator

  • Heat exchangers

  • Distribution systems through the plant to production suites, laboratories, cleaning stations etc


All equipment was craned into the building, and adjusted to final position before we installed interconnecting piping and required services piping.


Additionally, we installed new hot and cold WFI and pure steam ring mains throughout the plant.

Client

AstraZeneca

Industry

Pharmaceutical

Location

Macquarie Park, Sydney, NSW, Australia

Cost

$850K per suite

Duration

3 months per suite

Completion Date

various – 8 suites upgraded to date

Workforce at peak of project

10 on-site personnel per suite
Key Features of this Project
  • Adherence to strict ASME BPE QA requirements throughout, providing full traceability on installed equipment and piping

  • Over 2000 orbital welds per suite, with all welds externally inspected and 20% internally inspected by borescope

  • Pressure testing of each line at up to 1.5 times operational pressure

  • Passivation using Triplenine Group’s stand-alone system which can perform both ambient and high temperature passivation

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Sheet metal fabrication

Tube & Pipe Spooling

Orbital Welding

Coded Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Non-destructive Testing

Plant Installation

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page