project
AstraZeneca Solution Preparation Suites
Scope of Triplenine Group’s Work
AstraZeneca first employed Triplenine Group in 2012 to upgrade an existing solution preparation suite. After delivering the new fitout on time and within budget, we have worked with AstraZeneca to upgrade an additional 7 suites as well as other services.
Solution Preparation Suites
Each suite requires precision welding, testing and strict adherence to pharmaceutical-grade QA standards. Key elements of the upgrades include:
Fabrication of the internal access platform, stainless steel wall plates and wall and ceiling plates
Installation of platform sections around the central tank
Electrical cabling
Integration of the suites systems and power with other parts of the plant as required
Additional AstraZeneca Project: Water Room (2018)
In 2018 Triplenine Group also installed a new water room for AstraZeneca. This dedicated clean room included:
Storage tanks
RO (reverse osmosis) pre-treatment skid
WFI (Water for Injection) still
Pure steam generator
Heat exchangers
Distribution systems through the plant to production suites, laboratories, cleaning stations etc
All equipment was craned into the building, and adjusted to final position before we installed interconnecting piping and required services piping.
Additionally, we installed new hot and cold WFI and pure steam ring mains throughout the plant.
Client
AstraZeneca
Industry
Pharmaceutical
Location
Macquarie Park, Sydney, NSW, Australia
Cost
$850K per suite
Duration
3 months per suite
Completion Date
various – 8 suites upgraded to date
Workforce at peak of project
10 on-site personnel per suite

Key Features of this Project
Adherence to strict ASME BPE QA requirements throughout, providing full traceability on installed equipment and piping
Over 2000 orbital welds per suite, with all welds externally inspected and 20% internally inspected by borescope
Pressure testing of each line at up to 1.5 times operational pressure
Passivation using Triplenine Group’s stand-alone system which can perform both ambient and high temperature passivation