Baxter Healthcare Sterile Mix Room Installation
Scope of Triplenine Group’s Work
Baxter selected us to install a new wet product mix room at their Toongabbie expansion. This two stage process consisted of full off-site assembly and on-site installation.
We assembled all process tanks, equipment and piping in our Silverwater workshop.
Installation of new process equipment and integration of the new piping to existing process systems was carried out of production hours to avoid downtime to the existing plant.
Client
Baxter Healthcare
Industry
Pharmaceutical
Location
Toongabbie, Sydney, NSW
Cost
$1.4 million+
Duration
15 months
Completion Date
January 2011
Workforce at peak of project
14

Key Features of this Project
Off-site assembly in our workshop decreased downtime significantly, and reduced the project overrun caused by delays in other parts of the project.
All product contact tube was 100% orbital welded and 90% internally inspected.
Full QA documentation was compiled through the build phase to support smooth operations.
Client
Lorem Ipsum
Industry
Lorem Ipsum
Location
Lorem Ipsum
Cost
Lorem Ipsum
Duration
Lorem Ipsum
Completion Date
Lorem Ipsum
Workforce at peak of project
Lorem Ipsum
bottom of page

.png)