Baxter Healthcare Sterile Mix Room Installation

Scope of Triplenine Group’s Work
Baxter selected us to install a new wet product mix room at their Toongabbie expansion. This two stage process consisted of full off-site assembly and on-site installation.


We assembled all process tanks, equipment and piping in our Silverwater workshop.


Installation of new process equipment and integration of the new piping to existing process systems was carried out of production hours to avoid downtime to the existing plant.

Client

Baxter Healthcare

Industry

Pharmaceutical

Location

Toongabbie, Sydney, NSW

Cost

$1.4 million+

Duration

15 months

Completion Date

January 2011

Workforce at peak of project

14
Key Features of this Project
  • Off-site assembly in our workshop decreased downtime significantly, and reduced the project overrun caused by delays in other parts of the project.

  • All product contact tube was 100% orbital welded and 90% internally inspected.

  • Full QA documentation was compiled through the build phase to support smooth operations.

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Sheet metal fabrication

Tube & Pipe Spooling

Orbital Welding

Coded Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Non-destructive Testing

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page