Lion Craft Brewery – Overseas Passenger Terminal

Scope of Triplenine Group’s Work
The Squire’s Landing at the Overseas Passenger Terminal is a prestigious venue including a microbrewery and restaurant. Lion Australia engaged Triplenine Group to manage the end-to-end mechanical delivery of the microbrewery. 


This included:


  • 3D CAD modelling of all brewing equipment, pipework, conduits, and service racks to support installation planning and client review

  • Project and logistics planning to manage container unpacking, international equipment deliveries, secure off-site storage, and coordinated cranage/telehandler lifts into the microbrewery pod

  • Equipment installation: positioning and assembly of the brewhouse, fermenters, bright beer tanks, hot and cold liquor tanks, malt mill and grain handling systems, vapour condenser, operator platforms, and MCC (Motor Control Centre).

  • Pipework and service integration — fabrication and installation of:

    • Stainless-steel glycol distribution network with insulation and cladding

    • Water filtration skid and stainless-steel distribution lines

    • CO₂ supply and distribution systems (high and low pressure)

    • Hot and cold liquor lines

    • Beer python support conduits

    • Service racks, field conduits, and instrument mounting systems

  • Custom fabrication, including a new stainless grist tank, mounting frames, service racks, tank modifications (valve and fitting changes), and bespoke interface ‘T’ pieces

Client

Lion

Industry

Brewery

Location

Overseas Passenger Terminal, Sydney, NSW

Cost

$500k

Duration

3 months

Completion Date

December 2017

Workforce at peak of project

12
Key Features of this Project

This project had some of the most challenging logistics of any of our precision engineering projects.


The confined site footprint meant minimal laydown space, so we used extensive prefabrication and off-site staging. This meant we were scheduling delivery of large modules – right into the busy heart of Sydney. Managing timings to ensure smooth installation was vital.


At a high-visibility venue, we also had to ensure every detail – from welds, to finishes to cable concealment – was not only effective in practice but was also a visual showcase for quality craftsmanship. With limited space on site, we used CAD modelling, precise planning and careful sequencing of operations to ensure smooth delivery.


We managed all this within the strict safety and access protocols set by the Principal Contractor (Xenia Constructions). Site controls included inductions, SWMS, and strict working-hour constraints.


Successful delivery relied not just on quality, precision fabrication and installation, but also on planning, collaboration and communication with all parties.

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Sheet metal fabrication

Tube & Pipe Spooling

Tanks and pressure vessels

Orbital Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Plant and Engineering Design

Plant Installation

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page