Nu-Pure SYD3 Expansion to Bottling Plant
Scope of Triplenine Group’s Work
Working from a detailed 3D model and comprehensive scope, Triplenine Group provided full mechanical fabrication and installation services across multiple production areas, including:
Water Treatment Area: Installation of a new mixproof valve skid, carbon tower pipework modifications, and integration of additional microfiltration and silver ion treatment units to enhance product quality and capacity.
Tank Farm: Reconfiguration of purified water and spring water storage tank connections for improved product flow and operational flexibility.
New Line 3 Operational Area: Installation of break tank, pumps, dual UV treatment skids, silver ion unit, filtration systems, high-pressure receiver, and associated stainless steel pipework and supports.
Utilities Plant Room: Expansion of process cooling water, chilled water, and compressed air systems, including installation of new pumps, filters, and pipework to support additional production line requirements.
Utilities Connections to Line 3: Extensive chilled water and compressed air reticulation, including provision for multiple local dropper points to optimise operational efficiency.
CIP Skid Upgrade: Replacement of outlet CIP lines, installation of a new CIP supply pump, and increased line sizing to meet higher cleaning flow rates.
Client
Nu-Pure
Industry
Beverage
Location
Horsley Park, NSW, Australia
Cost
$1 million
Duration
4 months
Completion Date
August 2025
Workforce at peak of project
10
Key Features of this Project
Nu-Pure used the expansion required by strong demand as an opportunity to improve operations as well. The completed works support:
More reliable processing
Improved energy efficiency
More robust product safety measures
Triplenine Group demonstrated collaboration and project management skills, ensuring seamless integration of new equipment into existing systems. By minimising downtime, we were able to maintain production schedules and create extra capacity for future growth.