Asahi Beverages Spring Water Plant
Scope of Triplenine Group’s Work
Triplenine Group had two separate contracts in relation to this plant.
Asahi Beverages contracted us in relation to process and services systems and piping, including:
Pipe bridges
Cooling tower water
Reclaim
Sodium Hydroxide
High pressure compressed air (40Bar)
Low pressure compressed air
Steam and condensate
Hygiene station
Towns water
Trade waste
Storm water
Pacific Process hired us to provide detailed design, fabrication, installation and commissioning of all process services based on their design work. This contract included:
Tanker unload
Spring water Storage Silos and Manifolds
Carbon Filter
Micro Filter and UV Treatment
Ozonation
CIP Kitchen
Services Pipe Work
Client
Asahi Beverages
Industry
Beverage
Location
Huntingwood, Sydney, NSW
Cost
$2.1 million
Duration
8 months
Completion Date
November 2017
Workforce at peak of project
21

Key Features of this Project
Detailed design work for process systems
Installation of compressed air (high& low-pressure), steam, and condensate services
Integration of town water, trade waste and stormwater utilities
Client
Lorem Ipsum
Industry
Lorem Ipsum
Location
Lorem Ipsum
Cost
Lorem Ipsum
Duration
Lorem Ipsum
Completion Date
Lorem Ipsum
Workforce at peak of project
Lorem Ipsum
bottom of page

.png)