top of page
LogoPlaceholder.webp

project

Asahi Beverages Spring Water Plant

Scope of Triplenine Group’s Work
Triplenine Group had two separate contracts in relation to this plant.
Asahi Beverages contracted us in relation to process and services systems and piping, including:


  • Pipe bridges

  • Cooling tower water

  • Reclaim

  • Sodium Hydroxide

  • High pressure compressed air (40Bar)

  • Low pressure compressed air

  • Steam and condensate

  • Hygiene station

  • Towns water

  • Trade waste

  • Storm water


Pacific Process hired us to provide detailed design, fabrication, installation and commissioning of all process services based on their design work. This contract included:


  • Tanker unload

  • Spring water Storage Silos and Manifolds

  • Carbon Filter

  • Micro Filter and UV Treatment

  • Ozonation

  • CIP Kitchen

  • Services Pipe Work

Client

Asahi Beverages

Industry

Beverage

Location

Huntingwood, Sydney, NSW

Cost

$2.1 million

Duration

8 months

Completion Date

November 2017

Workforce at peak of project

21
Key Features of this Project
  • Detailed design work for process systems

  • Installation of compressed air (high& low-pressure), steam, and condensate services

  • Integration of town water, trade waste and stormwater utilities

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Tube & Pipe Spooling

Tanks and pressure vessels

Process Skid & Manifold Fabrication

Orbital Welding

Coded Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Plant Installation

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page