Scope of Triplenine Group’s Work

Triplenine was contracted by Bundaberg Brewed Drinks to upgrade their existing soft drink plant in Bundaberg, QLD. 


This involved the Installation of new tanks and processing equipment along with the automation of their Brew house and associated bulk processing equipment. The new brew-house provided increased plant capacity and improved process repeatability through improved CIP processes and automation. The new plant was installed in an existing warehouse area onsite allowing existing production to continue while the new brewhouse was being constructed.


A number of major components were fabricated in our Silverwater workshop prior to site installation commencing, approx 120mts of access platform complete with 2 x access stairs and incorporated pipe racks were fabricated in a modular format for ease of transport to site, other major items included 16 x valves manifolds in various sizes and shapes, holding tubes, pump and filter skids.

Site works involved the installation of new equipment and the relocation of existing equipment. The plant upgrade involves the following major components:


  • A total of 27 new vessels were installed including - Batch sugar dissolving & Storage, Cooking Stage, Wort Mix Stage, Fermentation Stage, Filtrate Holding Stage, Brew Mixing Stage, Brew/Syrup Holding, CIP, vessels ranged in size from 2k lt up 25k lt.

  • 1.25T Bulk sugar bag unloading and handling
    Tanker/IBC Loading station
    Juice loading station(2 off)
    IBC Fillers (2 off)
    IBC Cleaning station

  • Process and services piping - Steam and condensate, Chilled water/hot water Flow & Return, CIP fluids, Towns water, Product water, Transfer lines and Compressed Air, electrical conduiting.

  • Misc - Access platform, lifting equipment, pumps, heat exchangers


16,500 man hours went into this project with zero injuries. Constant performance monitoring was employed through weekly meetings and reporting.

Client

Bundaberg Brewed Drinks

Industry

Beverage

Location

Bundaberg, QLD, Australia

Cost

$1.7 million

Duration

6 months

Completion Date

June 2015

Workforce at peak of project

14
Key Features of this Project

Before site installation began, we fabricated 120 metres of access platform, complete with 2 sets of access stairs and incorporated pipe racks. We used a modular format for ease of transport to site.


Installation into a warehouse area of the existing site meant ongoing production could continue until the new plant was complete.


The new brew house increased plant capacity and made processes more robust and efficient via automation and better CIP processes

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Sheet metal fabrication

Tube & Pipe Spooling

Tanks and pressure vessels

Process Skid & Manifold Fabrication

Orbital Welding

Coded Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Non-destructive Testing

Plant Installation

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page