project
Nu-Pure Beverages Bottling Plant
Scope of Triplenine Group’s Work
TRIPLENINE was contracted by Manildra Group to provide fabrication, installation and commissioning support of all process and services systems based on design specifications
Systems include the following:
Unloading, unpacking and sorting of all equipment shipped from Italy/France, (Approximately 10 x 40’ shipping containers) required for the completion of the installation as detailed in the Piping and Instrumentation Diagrams.
Installation of all vessels, valves, instruments, pumps, heat exchangers and other misc equipment
Unloading, unpacking and sorting of piping shipped from Italy (approximately 10 x 40’ shipping containers).
Fabrication and installation of all company supplied pipework. Piping will arrive generally as described in the piping isometric drawings and will require some site measurement and completion of fabrication of spools. Piping to be completed to ASME standards and insulated to client specifications
Insulation of installed pipe work as called for by specification attached. Insulation was fully clad in 304 stainless steel.
Construction challenges
The new plant was located adjacent to the existing ethanol which presented a major risk due to the explosive environment, anything that could cause potential spark was prohibited from being used on the construction unless there were strict controls and monitoring in place to prevent potential sparking.
Triplenine work closely with the All Construction Engineering installation crew to install the piping simultaneously with the structural steel
Client
Nu-Pure Beverages
Industry
Beverage
Location
Horsley Park, Western Sydney, NSW, Australia
Cost
$2.6 million
Duration
8 months
Completion Date
May 2020
Workforce at peak of project
28

Key Features of this Project
This bottled water production facility was installed complete with a Krones blow-fill packaging line, which allows Nu-Pure Beverages to blow bottles into shape, fill them, then add caps and packaging in one streamlined process.