Scope of Triplenine Group’s Work
Lion Nathan installed a new beer processing room in a two-stage project. GEA Australia contracted Triplenine Group to do the following work:


Stage One:


  • Installation of all new process piping external to the new processing room

  • Integration with existing piping


Stage Two:


  • Installation of service and process tubes and pipes for a brand new processing area

Client

Lion / Tooheys Brewery

Industry

Brewery / Beverage

Location

Lidcombe, NSW

Cost

$2.3 million

Duration

10 months

Completion Date

May 2009

Workforce at peak of project

28
Key Features of this Project

All integration work was performed outside production hours to avoid downtime. Critical cut-ins were carefully planned and executed.


In the new processing area, we installed 10km of services and process tube and piping.

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Sheet metal fabrication

Tube & Pipe Spooling

Process Skid & Manifold Fabrication

Orbital Welding

Coded Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Non-destructive Testing

Plant Installation

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page