project
Tooheys Reverse Osmosis Water Recycling
Client
Lion Australia / Tooheys Brewery
Industry
Water
Location
Lidcombe, NSW, Australia
Cost
~$7.2 million
Duration
~3 years (24 weeks manufacturing, 10 weeks freight)
Completion Date
October 2024
Workforce at peak of project
8
Scope of Triplenine Group’s Work
Tooheys Brewery Recycled Water System – Advancing Sustainable Water Use
At the Tooheys Brewery, Triplenine Group delivered a high-performance reverse osmosis (RO) recycled water system designed to significantly reduce water consumption and support long-term sustainability outcomes.
This project forms part of Lion’s broader commitment to reducing environmental impact and investing in practical solutions that improve water efficiency, support decarbonisation, and contribute to a more circular approach to resource use.
Sustainability Outcomes & Water Savings
The system now plays a pivotal role in reducing the brewery’s water footprint by:
Recovering up to 30% of water used in cleaning and pre-production processes
Saving approximately 270 million litres of water annually
Equivalent to:
108 Olympic-sized swimming pools every year
Over 5.3 million kegs of water saved annually
Delivering >$700,000 in annual cost savings
By implementing a unique and efficient water recycling process, the project demonstrates how large-scale industrial facilities can make a substantial impact in reducing water waste and protecting valuable resources.
Smart, Efficient Water Recovery Technology
At the core of the solution is a fully integrated RO system engineered for reliability and performance:
80 m³/h average permeate production
60–70% recovery rate from MBR filtrate
Automated performance monitoring and optimisation
Advanced self-cleaning (CIP) functionality to maintain efficiency and extend membrane life
The system is built as a compact, European-manufactured skid, ensuring consistent quality, rapid installation, and long-term operational reliability.
Integrated Treatment & Reuse Systems
To ensure high-quality recycled water suitable for reuse across the facility, the system incorporates:
UV disinfection with continuous UVT monitoring
Chlorine dioxide dosing for residual protection
Soft remineralisation for process stability
Full integration into the site’s PLC and utilities infrastructure
The recycled water is utilised for non-product applications such as surface cleaning and cooling, reducing reliance on potable water without compromising product integrity.
End-to-End Project Delivery
Triplenine Group delivered a complete turnkey solution, including:
Design collaboration and system integration
Fabrication, testing, and installation of the RO system
Mechanical, electrical, and civil works
Full integration of piping, utilities, and control systems
Setting a Benchmark for Sustainable Manufacturing
Water is one of the most critical inputs in brewing, and projects like this highlight how innovation in water treatment can deliver meaningful environmental outcomes.
This installation sets a benchmark for best-practice water usage in the Australian brewing industry, demonstrating how businesses can adopt practical solutions that reduce consumption, improve efficiency, and contribute to long-term water resilience.
As highlighted in the project, every drop of water is valuable, and through initiatives like this, large-scale operations can play a leading role in conserving resources for the future.

Key Features of this Project
Lion Australia has a strong commitment to sustainability – the company was certified carbon-neutral in 2020 and has been using 100% renewable electricity since 2023. This project is part of that commitment.
It:
Recycles up to 30% of water used during cleaning and pre-production – this water is used for non-food surface cleaning and for cooling
Saves an estimated 270 million litres of water per year (108 Olympic size pools)
Reduces Tooheys annual water bill by around $700,000
Efficiency, reliability and ease of maintenance were also key design considerations. We delivered on these goals via the use of high-quality European parts; remote monitoring capabilities, and the advanced automation of the CIP system.