Watpac (now Thermo Fisher) Biologics Plant of the Future

Scope of Triplenine Group’s Work
Watpac contracted us to provide detailed design, equipment and material selections, fabrication, installation and commissioning of all process services based on design works carried out by their architect.


Systems included the following:


  • WFI (water for injection) pre-treatment, storage and distribution

  • Steam distribution, condensate collection

  • Compressed air generation and distribution

  • Process waste storage & treatment

  • Clean room service columns, service panels, pass through ports

Client

Watpac

Industry

Biopharmaceutical

Location

Brisbane, QLD

Cost

$2.2 million

Duration

14 months

Completion Date

2013

Workforce at peak of project

12
Key Features of this Project

Logistics and planning were key challenges in this project. Design detailing, equipment selection and long lead time items were all on the critical path of the project.


Some major pieces of critical equipment had to be sourced from overseas, so lead times had to allow for fabrication and shipping. Gathering all the required information and design data early was crucial in order to meet project deadlines. We were also communicating with stakeholders in multiple locations and time zones.


Triplenine Group was involved end-to-end, from detailed design and selection of equipment to final commissioning.

Triplenine Group Service Capabilities Used in this Project

General Fabrication

Sheet metal fabrication

Tube & Pipe Spooling

Process Skid & Manifold Fabrication

Orbital Welding

Coded Welding

Chemical Cleaning & Passivation

Hydrostatic Testing

Non-destructive Testing

Plant and Engineering Design

Plant Installation

Client

Lorem Ipsum

Industry

Lorem Ipsum

Location

Lorem Ipsum

Cost

Lorem Ipsum

Duration

Lorem Ipsum

Completion Date

Lorem Ipsum

Workforce at peak of project

Lorem Ipsum
bottom of page